Resource Profile - INCRLEN
-  Currently, we re-plan from scratch without    setting the resource abstraction switch
-  Other options are:    - Use failure level and current plan to re-plan      with abstraction switch set   -  Use failure level and current plan to re-plan      without abstraction switch set   -  Scheduler asks planner for a different       abstract plan for resource allocation