PPT Slide
Resource Domains:
A1, A2 , A3: {R1 , R2}
A4, A5: {S1 , S2 , S3}
Resource Constraints:
A1 ? A2 ; A2 ? A3 ;
A1 ? A3 ; A4 ? A5 ;
N1: {A1 = R1}
N1: {A1 = R1, A2 = R2}
N1: {A1 = R1, A2 = R2 , A4 = S1}
N1: {A1 = R1, A2 = R2 , A4 = S1 , A3 = R1}
N1: {A1 = R1, A2 = R2 , A4 = S1 , A3 = R2}
A1 = R1
A2 = R2
A4 = S1
A3 = R1
A3 = R2
Subset of variables that can not be
assigned values (reason of failure):
(A1 , A2 , A3)